Skip to content
Neo Forge Technology

CAD-to-BIM Conversion & Validation Studio

Lakeside Office Conversion · LKS-A100-Ground-Floor.dwg · Stage 1 of 8

Simulated demo · sample data

Source CAD drawing

Office 1Office 2Office 3ReceptionMeeting RoomServer RoomDeskDeskDeskDeskTableDesk70006000600060007000GROUND FLOOR
X — Y —73 objects

Selected source object

Click an object in the drawing.

1. Source Drawing

Ready
File
LKS-A100-Ground-Floor.dwg
Declared units
Millimetres
Objects
73
Layers
10

A sample plan of a small office, represented as CAD objects with layers. Review the drawing, then confirm it as the source.

Pipeline log

  • Nothing has run yet.

Generated BIM model

Loading 3D model…
The BIM model appears here after stage 6 (BIM Generation).

Selected BIM element

No model generated yet.

Browser simulation on an invented drawing: the transformation, counts and validation are computed from the sample objects, and the output is a JSON dataset. It does not read DWG or DXF files, and it does not produce IFC or Revit files.

Interactive demonstration using sample data. Features illustrate possible software capabilities and do not necessarily represent a completed client deployment. This browser demo does not connect to the desktop application.