CAD/BIM portfolio / 20
Construction Quantity Takeoff & Cost Estimation
Quantities from drawings and models with configurable rates.
Status
Built and tested: quantities match hand calculations; rates are placeholders.
What it does
- Quantities from DXF/SVG/image geometry or from IFC stored quantities
- Walls, slabs, roof, openings, columns, stairs, finishes and MEP runs with basis of measurement
- Waste per line, editable unit rates, overhead/profit/contingency/tax
- Exclusions and unmeasured elements listed; placeholder rates labelled
- BOQ and summary as CSV, PDF, HTML, JSON
Supported files and engines
Files: DXF, IFC. Engines: Built-in engines.
Demonstrations run on bundled synthetic samples or on files you upload. Sample results are labelled as sample data. Automated results are preliminary engineering aids, not verified design, code-compliance, structural or construction documents.